Plans for the MAR line

Project Name

The train will go on in every single quadrant of Calgary. It will go in ward 7,11,14,13,12,9,10,4, and 6.

InkedScreenshot 2022-09-09 181240.jpg

Why 4 sections 

We are building it in 4 sections because that is how I design it to match up in with the quadrant.

InkedScreenshot 2022-09-09 181240.jpg

Type of train

The type will most likely be high-floor LRT like the Calgary Blue and Red line or like the Montreal REM because it is mostly going to be going on the side of the road

download09.jfif

Maintain and storage 

The Maintain and storage will most likely be near Glenmore trail to the North. There only going to be 1 huge Maintain and storage facility because trying to find land big enough is hard in Calgary. 

Screen-Shot-2021-07-21-at-7.42.43-PM.png

Why we should build it 

I think this line this line is important is because it a ring. let's say that if you live in the NW comes of Silver Springs, Calgary and you want cities someone who lives in the SE comities of Deer Ridge you would have to take the red line and then have to take a bus to it bus or you could drive which would be faster but you could get caught in traffic and car let of toxic fuels into the air 

InkedScreenshot 2022-09-09 181240.jpg

The number of station

There will be around 49 stations and the length will most likely be 66.80 Km

One_Street_Southwest_(C-Train)_1.jpg